Set up the project budget
  • 2 Minutes to read

    Set up the project budget


      Article Summary

      The budget module provides a template file. You can download the file, enter the values for each budget line-item and upload it to the same module as a draft. Once added as a draft, you can make any additions, corrections, and additions to the budget at any time until it is locked to serve as the baseline. 

      To set up the budget

      • Open the project management console
      • Click 'Budget' on the top
      • Select 'Project Budget' from the options on the left
      • Click 'Create Project Budget'

      The 'Upload Project Budget' page opens:

      • Click 'Download' to obtain the template for the budget in Excel file format. The template file contains the required field headers. 
      • Enter the values for the lin-items as explained below.

      Requirements of the budget file

      • Each line in the file should contain one budget line item.

      Enter the values for each line-item under the following column headers:

      • Cost Code - The code representing the division/category of work as per the cost code list at your company level
      • Name - The label of the work/task
      • Quantity - The numeric value of the amount of work required to be done
      • Quantity Unit - Units by which the amount of work done is measured
      • Effort Hours - The total working time required for completion of the work, in manhours
      • Type of Calculation - Specify how the budget amount for this line item is to be entered. The allowed strings are 'Automatic' and 'Manual.' Leave this column blank if you want to set this on the console after uploading the budget.
        • Automatic - The total amount is calculated as a sum of the values specified for different cost types, like material, labor, equipment, etc.
        • Manual - You can enter the total budget amount manually in the next column.
      • Total Budget Amount - Enter the total budget amount if you have chosen 'Manual' in the previous column. Else leave this field blank. The field will be auto-populated on the console, using the cost values entered in the following seven fields.
      • Labor - The monetary value of the cost allotted for the wages
      • Equipment - The monetary value of the cost allocated for the use of equipment and machinery for the work
      • Subcontractor - Expenses related to external subcontracts, if any. 
      • Material - The monetary value of the cost allotted for the materials used for the work
      • Others - Miscellaneous expenses like transportation, material handling, fees paid to various vendors, agencies, and more.
      • Overhead - Operation costs that the company bears
      • Profit - The profit gained by your company from the work item 
      • Assigned To - The subcontractor company to which the line item is allotted. This field is optional. If you want to specify the assignee company at a later time, you can do it after uploading the budget but before locking it. See Assign subcontractors to budget line items to know more.

      Save the Excel file with an appropriate name. See Upload the budget file for more.